Starter Shingles 

  • Starter shingles required on all edges of the roof.
  • Angle Cut Rake starter shingles at 45 degrees and lay it on a lower corner of the roof, the edges should be 1/4" to 3/4" overhung past the drip edge.
  • Ensure that the starter shingle is positioned with the factory-applied sealant strip face up and the strip adjacent to the eave side of the roof.
  • Continue across the eave of the roof with starter shingles butting them loosely together to prevent buckling.

Image Placeholder