Headwall Roof Flashing 

  • 6x6 Metal Head Wall flashing installed at all joints in the roof where a vertical surface meets the rooftop.
  • Anytime there is a splice in the metal head wall flashing its necessary to add 2 beads of roofing cement at overlap. Minimum overlap is 6" inches. 
  • When house wrap is used it should be countered over all flashing. 
  • Flashing should occur where roof trusses/roof frame meets the sloped roof plane (this includes on the ends of Dutch gables and where dormer roofs connect).
  • Tape top of flashing to the wall.
  • Self adhered flashing must go up chimney walls 4"
  • Side wall and head wall flashing are described below. 

 

Image Placeholder

Image Placeholder

Image Placeholder

Image Placeholder

Image Placeholder

Image Placeholder

Image Placeholder