Drip Edge 

  • 2x2 metal drip edge is properly installed with no pieces missing or bent. See Valley Flashing & Drip Edge Diagram
  • Drip edge should NOT be nailed with plastic nails. a standard roof composition nail should be used.
  • Pieces overlap towards the back of the home so the seam is less visible from the front
    Installed before felt.
  • Installed with no small pieces (12” or less) near the bend (gables, corners, entryway, etc.)
  • The drip edge should wrap every bird box.
  • Drip edge is cut and folded to not have a hole on the outside corners.
  • Drip edge must be nailed at least every 12" per code and overlap at least 2"
  • When drip edge on a rake meets the center of valley, drip edge must be stripped off with self adhered.

Image Placeholder

Image Placeholder

Image Placeholder

Image Placeholder

Image Placeholder

Image Placeholder

Image Placeholder
Image Placeholder

Image Placeholder