Top-Out Showers

  • The base is installed with clips side panels are screwed into studs.
  • Showerhead rough-in installed at 80” AFF.
  • Handicap shower is installed where needed, per panel.
  • Concrete is poured under the base.
  • Plumbing blocking is flush with the wall unless tiled. Tiled wall blocking is set 1 1/4" back.

 