Top-Out Showers
- The base is installed with clips side panels are screwed into studs.
- Showerhead rough-in installed at 80” AFF.
- Handicap shower is installed where needed, per panel.
- Concrete is poured under the base.
- KOHLER Plumbing wall blocking is set 1 3/4" back from face of stud if Shower gets a Surround
- KOHLER Plumbing wall blocking is set 2 3/4" back from face of stud if Shower gets Tile



