Top-Out Showers

  • The base is installed with clips side panels are screwed into studs.
  • Showerhead rough-in installed at 80” AFF.
  • Handicap shower is installed where needed, per panel.
  • Concrete is poured under the base.
  • KOHLER Plumbing wall blocking is set 1 3/4" back from face of stud if Shower gets a Surround 
  • KOHLER Plumbing wall blocking is set 2 3/4" back from face of stud if Shower gets Tile 

 

Image Placeholder

Image Placeholder

Image Placeholder

Image Placeholder