Batt Insulation: Lower Wall

  • Walls
    • R13 Lubbock
    • R15 Amarillo, Midland, Odessa
  • Ceiling
    • R30 LBK
    • R38 Midland/ Odessa
    • R40 Amarillo

 

  • Min insulation value specified in Detail D-1 in the plan set.
  • The paper should be stapled over studs to ensure the seal.
  • Junction boxes (outlet, light switch, etc.) should be cut out to allow insulation to fill the wall effectively.
  • All cavities in walls filled.
Image Placeholder

Image Placeholder

Image Placeholder