• Formed just after pour while concrete is still wet.
  • 6’ 4” max spacing on the driveway, 4’ max spacing on the sidewalk.
  • Control joints should line up with outside corners.
  • Control joints are straight.
  • At least 1” in cut depth.
Image Placeholder

Image Placeholder

Image Placeholder