VAPOR BARRIER 

  • The whole home will requires a vapor barrier to be installed (Excluding Garage)
  • Vapor barrier is required to me a minimum of 6 Mill Polyethylene plastic 
  • Vapor Barrier must go to the perimeter footing
  • All overlaps in minimum of 12" at each seem 
  • All vapor barrier seams are required to be taped with approved tape (Flashing tape or Stego Tape)
  • All plumbing penetrations are required to be taped 
Image Placeholder
Image Placeholder
Image Placeholder
Image Placeholder