- Rebar size and location to be determined from (slab foundation detail D-1.8) in plan set.
- Grounding rod located per (slab plan C-2.1) in plan set.
- All rebar is to be placed within 1/2” tolerance of details.
- Secure rebar with wire ties. (Every other intersection per plan.

