• Slab soft cuts are 1” deep on a 4" slab.  (1/4 of the thickness)
  • Soft cuts are made the same day in summer or the next morning in the winter.
  • The garage slab has tooled control joints in both directions.
Image Placeholder

Image Placeholder

Image Placeholder

Image Placeholder

Image Placeholder